Guide · Part 107 waivers

How to get a Part 107 waiver to fly beyond visual line of sight

If your drone weighs under 55 lb, a waiver of §107.31 is how you fly beyond visual line of sight (BVLOS) today. This is the FAA's current process, from choosing the right approval to answering the FAA's questions after you apply.

Checked against the FAA sources listed below on November 3, 2026.

Rule waived
§107.31, visual line of sight
Where to apply
The FAA’s new waiver system (AIS Services, called Aviation Safety Hub in the FAA’s guide), signed in with Login.gov
Start date
At least 90 days after you apply, as the FAA recommends
Longest waiver
48 months from the start date
FAA’s target
A decision within 90 days
Questions from the FAA
Answer within 30 days, or the application is canceled

Is a waiver the right approval?

Which FAA approval you need depends on the aircraft and the job:

  • Aircraft under 55 lb, flown under Part 107: a Part 107 waiver of §107.31. This guide covers it.
  • Aircraft of 55 lb or more: Part 107 doesn't apply, so you need an exemption under Section 44807 instead, filed as a petition at regulations.gov.
  • Spraying crops or other agricultural products: an exemption plus a Part 137 certificate, even under 55 lb. See spray drone approvals.
  • Police, fire and other public safety agencies: can apply as a Public Safety Organization. The FAA limits these applications to §107.31, §107.39 and §107.145, makes the safety explanation optional, and requires its PSO checklist.

Many BVLOS operations need more than one rule waived. You choose them together in the same application. The rules the FAA can waive under Part 107 are §107.25 (flying from a moving vehicle), §107.29(a)(2) and (b) (night and twilight lighting), §107.31 (visual line of sight), §107.33 (visual observers), §107.35 (more than one aircraft per pilot), §107.37(a) (yielding right of way), §107.39 (over people), §107.51(a) to (d) (speed, altitude, visibility and cloud clearance) and §107.145 (over moving vehicles).

What to prepare first

Have these ready before you open the application, because one step can't be undone (more on that below):

  • Your operation details: each aircraft's type, make, model and quantity, the start and end dates, and the location with latitude and longitude. A map of the area is optional but helps.
  • A few yes-or-no facts: the application asks whether you'll carry hazardous materials, fly for compensation and cross state lines.
  • A concept of operations (CONOPS): one document describing the operation, aircraft, crew and safety measures. The FAA recommends uploading one. If you do, its system uses AI to draft your answers to the safety questions from it, so the more complete your CONOPS, the better those first drafts. You still review and edit every answer.
  • Your answers to the FAA's safety questions: for §107.31 there are questions on position tracking, staying in the area, link limits, the route, return-to-home, avoiding other aircraft, people on the ground, lighting, alerts and failures, training, weather and the command-and-control link. See every question and how to answer it.

You don't need to register your drones to apply, but every aircraft must be registered before you fly under the waiver.

The application, step by step

New Part 107 waiver applications no longer go through FAADroneZone. The FAA moved them to its new system, Aviation Integrated Safety (AIS) Services, which its applicant guide calls Aviation Safety Hub. Waivers submitted in FAADroneZone before the switch are still processed there, and airspace authorizations stay in FAADroneZone for now.

  1. Sign in. Create a Login.gov account if you don't have one, then sign in to Aviation Safety Hub and start a Part 107 operational waiver application.
  2. Operator information. Your details as the operator applying.
  3. Proposed operation. Your aircraft, dates and location. The FAA recommends a start date at least 90 days after you apply. The end date can't be more than 48 months after the start.
  4. Requested waivers. Select §107.31 and any other rules from the list above.
  5. Supporting documentation. Upload your CONOPS and anything else that supports the request.
  6. Safety evaluation. Answer the FAA's questions for each rule you selected. Once you move on to this step, you can't go back and edit the earlier ones, so check them first. You can save and come back before then.
  7. Submit and watch for questions. If the FAA sends a request for information, answer within 30 days or the application is canceled and you have to start over. You can upload an updated CONOPS with your answer.
  8. Decision. The application ends as issued, partially approved, denied or canceled. An issued waiver comes with conditions you must follow.

Why BVLOS waivers get disapproved

The FAA says its main concerns are how your operation stays safe at all times, even in unusual circumstances, what could happen, and how you'll handle each case. Its waiver page is direct about the most common failure: if the application doesn't identify the hazards of the operation and propose ways to reduce them, the FAA can't complete its safety review and disapproves it for insufficient information.

In practice, that usually comes down to a few patterns:

  • General answers. “The pilot will monitor the airspace” doesn't say how, with what, how far out, or what happens next. Name the equipment, the distances and the steps.
  • No plan for failures. Lost link, lost GPS, low battery, an aircraft entering the area: each needs an alert and a procedure.
  • Answers that don't match the CONOPS. Different altitudes, crew sizes or limits in two places raise questions.
  • Answers for rules you didn't request. The FAA asks you to include only what applies to the rules you selected.
  • Night flights without night mitigations. The FAA may limit the waiver to daylight if you don't explain how you handle night and twilight.
  • A missed request for information. No answer within 30 days cancels the application.

How long it takes

The FAA says it aims to approve or disapprove waiver requests within 90 days, and recommends a start date at least 90 days out. A complex request, or one that draws a request for information, can take longer, so plan your first BVLOS job with some margin. A waiver can last up to 48 months. Apply for a new one well before yours ends, allowing the same 90 days.

After you're approved

Your certificate of waiver lists conditions you have to follow on every flight under it. Build them into your checklists and training, keep your training records current, and fly only the aircraft, area and dates the waiver covers. If the operation changes, such as a new area, more aircraft or a different aircraft, check whether it still fits the waiver or needs a new application.

Sources

This guide is general information, not legal advice. The FAA changes these processes without a rulemaking, so check its current pages before you file. Spotted something out of date? Email support@paperwing.org.

Where Part 108 stands

Checked November 7, 2026. Part 108 is still a proposed rule. The FAA sent the final rule to the White House for review on July 10, 2026, and no publication date has been announced. The proposed rule would let operators fly beyond visual line of sight under an FAA operating permit or certificate instead of a waiver or exemption.Get an email when it's published or see the rule status and update log.

How to get a Part 107 BVLOS waiver (§107.31), step by step · Paperwing